SDS 2015-2018 Summary Tables
Goal #1: Contribute to the protection of the atmosphere and to reduce gaseous emissions that are responsible for
global warming and climate change.
Objective #1: Reduce the negative environmental impacts of pollutants and conserve energy.
Atlantic Region |
Commitment/Target 1.1 |
Complete the design phase to convert buildings 18 & 25 from electric heat to district hot water heating system (central heating plant) at Springhill Institution. |
Commitment/Target 1.2 |
Connect the Structured Living Environment (SLE) to the Building Management System at Nova Institution. |
Commitment/Target 1.3 |
Replace all masts and fence lights with LEDs at Atlantic Institution. |
Commitment/Target 1.4 |
Replace flood lights with LEDs in the medium sector at Dorchester Penitentiary. |
Quebec Region |
Commitment/Target 1.5 |
Establish a regional automation program to optimize energy consuming systems for all institutions in Quebec Region. |
Commitment/Target 1.6 |
Initiate a project to upgrade the centralized heating system at Cowansville Institution. |
Commitment/Target 1.7 |
Reduce electrical consumption by gradually replacing the perimeter lighting at Drummond Institution. |
Commitment/Target 1.8 |
Replace the perimeter lighting systems with LEDs at La Macaza Institution. |
Commitment/Target 1.9 |
Implement a renewable energy project at the Federal Training Centre. |
Ontario Region |
Commitment/Target 1.10 |
Implement a solar energy project at Collins Bay Institution |
Commitment/Target 1.11 |
Replace all street lighting with LEDs at Bath Institution. |
Commitment/Target 1.12 |
Install motion detection sensors and LED lighting in the tunnels at Millhaven Institution. |
Commitment/Target 1.13 |
Install LEDs on all lighting fixtures inside the compound at Grand Valley Institution. |
Commitment/Target 1.14 |
Install new building automation systems at Regional Headquarters and Joyceville Institution. |
Note: Timeline for all targets is March 31, 2018.
Prairie Region |
Commitment/Target 1.15 |
Install solar panels to existing buildings at Willow Cree Healing Lodge. |
Commitment/Target 1.16 |
Install ozone system in the main laundry at Drumheller Institution. |
Commitment/Target 1.17 |
Replace all street lighting with LEDs at Okimaw Ochi Healing Lodge. |
Commitment/Target 1.18 |
Retrofit existing infrastructure to increase energy efficiency in the administration building at Bowden Institution. |
Commitment/Target 1.19 |
Replace all street lighting with LEDs at Stony Mountain Institution. |
Commitment/Target 1.20 |
Replace a boiler unit to a higher energy efficiency system at Grierson Institution. |
Commitment/Target 1.21 |
Upgrade an energy inefficient air conditioning system at Edmonton Institution. |
Commitment/Target 1.22 |
Replace all perimeter lighting to LEDs at
Pê Sâkâstêw Centre. |
Commitment/Target 1.23 |
Replace all outdoor lighting on housing units with LEDs at Edmonton Institution for Women. |
Commitment/Target 1.24 |
Implement a solar array system at Saskatchewan Penitentiary. |
Commitment/Target 1.25 |
Install a heat recovery system on an existing unit at the Regional Psychiatric Center. |
Pacific Region |
Commitment/Target 1.26 |
Integrate meters into DDC controls and set up digital energy recording at Mission Institution. |
Commitment/Target 1.27 |
Convert existing lighting systems to LEDs at William Head Institution. |
Commitment/Target 1.28 |
Integrate electrical and gas meters into DDC controls and set up digital energy recording at Mountain Institution. |
Commitment/Target 1.29 |
Install occupancy sensors in all boardrooms and Staff washrooms at Kwikwèxwelhp Healing Village. |
Commitment/Target 1.30 |
Replace all road lighting to LEDs at Matsqui Institution. |
Commitment/Target 1.31 |
Replace all road lighting to LEDs at Matsqui Institution. |
Commitment/Target 1.32 |
Replace all road and parking lot lighting to LEDs at Pacific Institution. |
Goal #2: Contribute to the protection of natural habitats and reduce pollution to aquatic ecosystems.
Objective #2: Preserve the quality of the natural environment and conserve water.
Atlantic Region |
Commitment/Target 2.1 |
Improve waste sorting capabilities at Dorchester Institution. |
Quebec Region |
Commitment/Target 2.2 |
Reforest the access road at Donnacona Institution. |
Commitment/Target 2.3 |
Replace water-cooled air conditioning systems at Port-Cartier Institution. |
Commitment/Target 2.4 |
Replace water-cooled air conditioning systems at SADP complex. |
Ontario Region |
Commitment/Target 2.5 |
Install automatic shower shut-off in three living units at Beaver Creek Institution. |
Commitment/Target 2.6 |
Install automatic shower shut-off in three living units at Beaver Creek Institution. |
Commitment/Target 2.7 |
Establish an effluent reuse system at the wastewater treatment plant at Warkworth Institution. |
Pacific Region |
Commitment/Target 2.8 |
Conduct a kitchen water use study following the cook chill implementation at Mission Institution. |
- Date modified :